I thought I asked my last question via a post a couple days ago concerning winterization. This is my first time. Well Im back to information frustration. I went up to the TT today and drained everything. Im going up to blow it out tomorrow. Seeing you must have everything done by Oct 31 (they lock the gates), a number of others were there doing there thing. Got in a converstation with others on how we where doing it. Well after I blow the lines out I am going to put the Red Jucie in the lines. Here is the question. Talked to 4 other people and two said after filling lines leave all faucets, shower head, hot water drain, and otside shower valves OPEN. Two others said to SHUT them. I go for SHUT. Who is correct?? Where the TT is located is slated for its first freeze this coming weekend. Sorry for being a pest but it seems that both in print and in person you get different answers. Whats cute is the manual does not say what to do. Maybe both will work?
Thanks
Bill
DBF
Thanks
Bill
DBF